top of page
SCAQMD PERMITTED SYSTEMS
SCAQMD Permitted Systems
GEO has a large fleet of pre-permitted soil vapor extraction and multiple-phase extraction
systems with permits to operate at “various locations” in the South Coast Air Quality Management District. Generally, these systems can operate for up to 12 months at a project using their respective “various locations” permit. A summary of GEO’s pre-permitted systems appears below. Please contact us to learn more about our current capabilities and inventory, or to schedule a pilot test.
bottom of page